Remodel coming soon
March 30, 2021
In about 2 weeks (middle of April) we are remodeling the store. While the main shop will be closed we will have a pop-up shop in the Annex during normal store hours. Here is the overall plan for the remodel which should take 2-3weeks:- Temporarily move inventory to the Annex
- Remove the backroom wall to make a longer storefront
- Repaint the entire store
- Re-carpet the store and refloor the bathroom
- Set up new fixtures and move existing ones.
